2013
Cathedral Ledge 8/7/13
Thin Air & Square Ledge
EPSCoR Albedo Project UNH
Frankenstein Cilff's 3/2/13
Standard & Waterfall
Frankenstein Cliff's 2/16/13
Bob's Delights, The Cave Route, Walk in the Forest
Frankenstein Cliff's 3/14/13
Standard, House of Blue & Dracula
Frankenstein Cliffs 1/13/13
Standard & Dracula
Kinsman Notch 12/19/13
Kinsman Notch 1/17/13
Shamrock, Pot 'O Gold, The Beast
Mount Jackson & Mount Webster Loop 8/6/13
Mount Kearsarge 9/29/13
Mount Willard 1/27/13
Gully #1, 1.5
Mount Willard 2/17/13
Left Hand Monkey Wrench, The Cleft, Read Between the lines
Mount Willard 3/1/13
Gully #1, The Cleft, East Face Slab Right & Upper Hitchcock
Mount Willard 3/11/13
Left Hand Monkey Wrench, Read Between the Lines, The Cleft, East Face Slabs & Upper Hitchcock
Mount Willard 12/30/13
Mount Willard 1/12/13
Gully #1, 1.5 & Cauliflower Gully
Smart's Mountain 10/14/13
Stonehouse Pond 2/3/13
Stonehouse Pond 2/22/13
Stonehouse Pond 2/26/13
The Black Dike 2/7/2013